Is Industry-4.0 the New Accelerator to Lean Manufacturing? | Authored by Dr. Ravindra Ojha

Under the Lean domain the much discussed eight manufacturing process wastes with the acronym DOWNTIME, are: Defects in output, Over-production, Waiting, Non-utilization of human talent, Transportation not adding value, Inventory in excess, Motion not warranted and Excess-processing. A deep analysis indicates that the digital world of I4.0 can significantly reduce each of these eight wastes significantly, thereby improving leanness of systems.   

Read More.

Recently in Media

National Education Day 2025: When Youth and AI Co-Create the Future of Learning | Quote by Dr. Vibhav Singh
Read More
Why Chasing Every New IPO Can Hurt Your Portfolio | Authored by Dr. Jayatu Sen Chaudhury
Read More
Contact Us
  • Great Lakes Institute of Management,
    2nd Floor, Orchid Centre,
    Golf Course Road, Sector 53,
    Gurugram, Haryana 122003

Global Associations

Back to Top